Power to Some Buildings: Scheduled Maintenance

Wednesday, 15 April 1 hour
Scheduled
Scheduled

On Wednesday, April 15, from 5 to 6 a.m., National Grid (our public utility provider) will be conducting a necessary power outage to perform essential maintenance and system upgrades for Clark’s electrical infrastructure that will require a campus-wide power shutdown. The following buildings on the Main Campus will be affected:

151 Woodland, Admissions House, Atwood Hall, Bassett Admissions Center, Blackstone Hall, Bullock Hall, Carlson Hall, Dana Hall, Dodd Hall, Estabrook Hall, Geography Building, Goddard Library, Hughes Hall, Jefferson Academic Center, Johnson Sanford Center, Jonas Clark Hall, Kneller Athletic Center, Lasry Center for Bioscience, Math-Physics building, Maywood Hall, Sackler Sciences Center, Michelson Theater, and Wright Hall.

As a result of the power outage there may be a brief interruption of network connectivity. Electrical contractors and Clark Facilities trades staff will do everything possible to minimize the duration of the power outage.

If you have any questions about this outage or need additional technical support after 6:00 AM, please contact the ITS Help Desk at 508-793-7745 or helpdesk@clarku.edu

Affected components
  • Network
  • Campus Power
  • VPN - Global Protect
  • Other